Procurement and Vendor Quotes

What Should Be Included in a Vendor Request for Quote

A good RFQ defines what vendors must price and gives them a consistent way to disclose assumptions.

Published Updated 2 min read

Describe the requirement

State the product or service, quantities, specifications, drawings, performance location, and required dates. Identify whether pricing should include freight, delivery, installation, protection, permits, taxes, travel, disposal, training, or closeout documents. If an item is optional, request it as a separate alternate.

Tell vendors how to handle substitutions and incomplete information. A vendor should not have to guess whether an equivalent product is acceptable or whether an unanswered question should be carried as an allowance.

Define the response

Request the total, line-item breakdown where useful, lead time, schedule, quote validity, payment terms, warranty, assumptions, exclusions, and point of contact. Provide a submission deadline and a clarification deadline. Include the requested file format or submission method if consistency matters.

For services, ask who provides supervision, tools, equipment, temporary protection, cleanup, and disposal. Small omissions in these categories frequently become large project disputes.

Control changes

WestBridge Office Group requested pricing for a receiving and installation project but initially omitted the storage duration. Vendors made different assumptions, making the first proposals impossible to compare. The buyer issued a revised RFQ that specified thirty days of storage and asked vendors to price additional time separately.

Every material change should receive a revision number and be distributed to all active vendors. Ask for acknowledgment so the buyer knows which version each vendor priced. The goal is not a long RFQ. It is a complete request that reduces hidden assumptions.

Practical takeaways

  • State quantities, location, timing, and included services.
  • Request assumptions and exclusions explicitly.
  • Define clarification and submission deadlines.
  • Issue controlled revisions when requirements change.

Company names and identifying details in the examples are fictionalized composites based on common commercial quoting and project-delivery situations.

Keep every quote, revision and customer decision organized.

Track Your Quotes Free